ADVERTISEMENT FOR BID
Owner: The Southern Ute Indian Tribe (SUIT)
Utilities Division
PO Box 1137
16360 Highway 172
Ignacio, CO 81137
(970) 563-5500
Separate sealed BIDS for the construction of the SUIT Shoshone Waterline Replacement Project - Phase 2 will be received by the Owner at the offices of the SUIT Utilities Division, until 3:00 p.m. (M.D.S.T.), Thursday, July 2, 2026. The bids shall be reviewed privately, and all respondents shall be notified of the selected bidder within 10 days.
Description of Work: Project requires installation of ~3,000 linear feet of 8” potable water utility pipeline (bored and trenched), reconnection of seven (7) existing user water service lines, five (5) connections to existing watermains and two (2) existing fire hydrant reconnections. Site is to be seeded and restored to pre-construction condition.
Prospective BIDDERS are REQUIRED to attend the MANDATORY pre-bid meeting on Wednesday June 17th at 11:00 AM at the SUIT Utility office, located at 16360 Highway 172 Ignacio, CO 81137. Followed by a site walk through.
This Project is subject to Prevailing Wage Rates and associated compliance and reporting criteria. Minimum wage rates can be found at: Decision #CO20250003
Bidder Prequalification Requirements: Contractor must have a minimum of five (5) years’ experience. Bidder must provide five (5) examples of prior or current projects in which a similar scope of work was performed. Example projects should demonstrate experience with horizontal directional drilling projects exceeding 1,000 linear feet with medium diameter pipe 8 inch or larger. Preference will be given to contractors with experience working in rocky conditions. Contractor shall provide current polyethylene (HDPE) fusion certification documents from a reputable organization such as McElroy, ISCO, or Secor with bid proposal. Contractor shall ensure all fuses are data logged and submitted.
Bid Security: A Bid security, in the form of a Bid Bond, Cashiers Check or Certified Check in the amount of 5% of the bid amount, must accompany each Bid.
The Successful Bidder will be required to furnish a Construction Performance and Payment Bonds as security for the faithful performance of the Contract.
Tribal Employment Rights Office
The Southern Ute Indian Tribe Tribal Employment Rights Office (TERO) has established a preference for contracting and subcontracting to certified Indian Owned Businesses (as defined in the Tribal Employment Rights Ordinance included in this project manual). A bid preference of 5% will be given to any qualified Native American owned company. To receive this preference, Native American owned companies must be certified by the Southern Ute Indian Tribe’s TERO. Any Native American owned business not certified by the due date will not be given a preference. For more information and/or questions in regard to certification, contact the TERO office at (970) 563-0117 or refer to the Southern Ute Indian Tribe’s TERO website at https://www.southernute-nsn.gov/justice-and-regulatory/tero/.
The Southern Ute Indian Tribe reserves the right to reject any and all proposals, to waive any informality in the bid process and to accept the bids deemed, in the opinion of the Tribe, to be in the best interest of the Southern Ute Indian Tribe.
THE CONTRACT DOCUMENTS may be examined at the following location:
GOFF ENGINEERING & SURVEYING, INC.
126 Rock Point Drive, Suite A, Durango, Colorado 81301.
(970) 247-1705
The Southern Ute Indian Tribe
Utilities Division
16360 Hwy 172, Ignacio, CO 81137
(970) 563-5500
Deadline for questions is 5:00 PM MDST June 30th, 2026.
Questions and requests for information are only available be per email request to
[email protected].