Work is scheduled to begin at 8:30 a.m. and be completed by 4 p.m. In some cases, properties located on a corner lot of the affected area also could be without water.

Residents of the affected area are advised to plan ahead for water for drinking, cooking and toilet flushing.

[email protected]