Durango Herald
--°F
Durango Herald
SUBSCRIBE
  • LOCAL
  • REGIONAL
  • PERSPECTIVES
  • NATION/WORLD
  • PUBLIC NOTICES
  • LISTEN
  • Local
  • Regional
  • Perspectives
  • Nation/World
  • Public Notices
  • Listen
  • SUBSCRIBE
Gallery

Photo: Making (Highway 550) connections

Herald Staff Writer

Friday, Sep 11, 2020 7:13 PM

SHARE
SHARE Facebook Twitter Email

Brandon Smith with Kelly Trucking and Lawrence Construction walks across a track-pad Friday that is used to keep dirt and rocks off the road at the U.S. 550/160 Connection South Project at Farmington Hill. Currently, a service road is being constructed to accommodate equipment and alleviate traffic impacts on U.S. Highway 550.
Brandon Smith with Kelly Trucking and Lawrence Construction walks across a track-pad Friday that is used to keep dirt and rocks off the road at the U.S. 550/160 Connection South Project at Farmington Hill. Currently, a service road is being constructed to accommodate equipment and alleviate traffic impacts on U.S. Highway 550.Jerry McBride/Durango Herald

Related Tags

Pine River Times News U.S. Highway 550

More Headlines

Third No Kings protest in Durango draws thousands
Durango

Third No Kings protest in Durango draws thousands

Estimated 3,200 protesters march down Main Avenue

Animas River expected to face low flows after sparse winter
Animas River

Animas River expected to face low flows after sparse winter

Outfitters say plenty of families enjoy low water levels

Southwest Colorado recreation industry can adapt during low-water years, panelists say
Drought

Southwest Colorado recreation industry can adapt during low-water years, panelists say

highlights strategies to sustain rivers and outdoor tourism during drought

Durango Herald

© 2026 Durango Herald | All Rights Reserved | Privacy Policy | Terms of Service