{"id":97328,"date":"2018-10-23T22:50:23","date_gmt":"2018-10-24T04:50:23","guid":{"rendered":"https:\/\/dh.durangoherald.com\/tj\/mancos-gym-and-school-construction-updates\/"},"modified":"2018-10-23T22:50:23","modified_gmt":"2018-10-24T04:50:23","slug":"mancos-gym-and-school-construction-updates","status":"publish","type":"post","link":"https:\/\/dh.durangoherald.com\/tj\/mancos-gym-and-school-construction-updates\/","title":{"rendered":"Mancos gym and school construction updates"},"content":{"rendered":"<figure class=\"wp-block-image naviga-inline-image naviga-align-left alignleft\" data-naviga-align=\"left\"><img decoding=\"async\" src=\"https:\/\/imengine.public.prod.dur.navigacloud.com\/?uuid=6f266f6a-c8f8-4b84-a305-8e7a0f7528e1&amp;function=cover&amp;type=preview&amp;source=false&amp;width=2000\" srcset=\"https:\/\/imengine.public.prod.dur.navigacloud.com\/?uuid=6f266f6a-c8f8-4b84-a305-8e7a0f7528e1&amp;function=cover&amp;type=preview&amp;source=false&amp;width=800 800w, https:\/\/imengine.public.prod.dur.navigacloud.com\/?uuid=6f266f6a-c8f8-4b84-a305-8e7a0f7528e1&amp;function=cover&amp;type=preview&amp;source=false&amp;width=1200 1200w, https:\/\/imengine.public.prod.dur.navigacloud.com\/?uuid=6f266f6a-c8f8-4b84-a305-8e7a0f7528e1&amp;function=cover&amp;type=preview&amp;source=false&amp;width=1800 1800w\" sizes=\"auto, (max-width: 480px) 100vw, (max-width: 1024px) 100vw, 2000px\" width=\"1042\" height=\"1388\" alt=\"Courtesy photoA view of ongoing construction of the gym addition in the Re-6 Mancos School District before work begins the week of Oct. 22. Foundation work at the site was set to continue, alongside drainage work.\" class=\"naviga-image\" loading=\"lazy\"><figcaption><span class=\"caption\">Courtesy photoA view of ongoing construction of the gym addition in the Re-6 Mancos School District before work begins the week of Oct. 22. Foundation work at the site was set to continue, alongside drainage work.<\/span><span class=\"credit\">du1-i-syn<\/span><\/figcaption><\/figure>\n<p>Phase 2, which is scheduled to be complete in April 2019, will see the additions to the district\u2019s main gym and elementary school, and the multipurpose building will also be remodeled.<\/p>\n<p>This week, construction crews led by owner\u2019s representative Monty Guiles, were scheduled to complete the pouring of cement stem walls at the Elementary School, an early step in setting the building\u2019s foundation.<\/p>\n<p>At the gym addition, plumbing foundation was scheduled to begin, alongsie slab prep, which is part of preparing a building\u2019s footing.<\/p>\n<p>Sanitary sewer and storm drain installation between the gym and West Wing was scheduled to be complete, and crews continued putting up cinder blocks for a fire wall at the south side of the addition.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Courtesy photoA view of ongoing construction of the gym addition in the Re-6 Mancos School District before work begins the week of Oct. 22. Foundation work at the site was set to continue, alongside drainage work.du1-i-syn Phase 2, which is scheduled to be complete in April 2019, will see the additions to the district\u2019s main [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":97329,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[5736,5735],"tags":[13,83,961,392],"naviga_topic":[],"class_list":["post-97328","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-local-news","category-news","tag-frontpage-lead","tag-mancos","tag-mancos-elementary-school","tag-mancos-school-district-re-6"],"acf":[],"author_name":"dh_admin","_links":{"self":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/posts\/97328","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/comments?post=97328"}],"version-history":[{"count":0,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/posts\/97328\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/media\/97329"}],"wp:attachment":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/media?parent=97328"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/categories?post=97328"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/tags?post=97328"},{"taxonomy":"naviga_topic","embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/naviga_topic?post=97328"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}