{"id":70717,"date":"2017-04-20T11:19:21","date_gmt":"2017-04-20T17:19:21","guid":{"rendered":"https:\/\/dh.durangoherald.com\/tj\/southwest-memorial-hospital-expansion-moves-ahead\/"},"modified":"2017-04-20T17:19:21","modified_gmt":"2017-04-20T17:19:21","slug":"southwest-memorial-hospital-expansion-moves-ahead","status":"publish","type":"post","link":"https:\/\/dh.durangoherald.com\/tj\/southwest-memorial-hospital-expansion-moves-ahead\/","title":{"rendered":"Southwest Memorial Hospital expansion moves ahead"},"content":{"rendered":"<figure class=\"wp-block-embed is-type-video wp-block-embed-youtube naviga-video-embed\">\n<div class=\"wp-block-embed__wrapper\"><iframe loading=\"lazy\" width=\"560\" height=\"315\" src=\"https:\/\/www.youtube.com\/embed\/9skn7PWwrzo\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen><\/iframe><\/div>\n<\/figure>\n<p>Once the entire project is done, which hospital public relations director Haley Leonard Saunders said should be in 2018, it will include a new inpatient wing, a retail pharmacy, a new medical office building, additional parking, a new lobby and the EMS station. About 50 people are at work on the additions now, and project manager Rick Fleming, of Nunn Construction, said he expects as many as 150 to arrive later this summer.<\/p>\n<p>The EMS station is the closest to being completed, and Fleming said it should take just a few more months to finish.<\/p>\n<p>On Wednesday, April 19, several construction workers could be found drilling into the concrete foundation and swinging a crane over the largest addition to the hospital, the new inpatient wing.<\/p>\n<p>It will house about 20 beds, including four intensive care units and three labor and delivery rooms, according to Saunders. It will also include a reception desk at the entrance, which she said will help hospital staff keep people from entering rooms without permission. \u201cWe have a really open environment right now,\u201d Saunders said. \u201cWe\u2019re excited to be able to greet people, catch them and then send them to the right place.<\/p>\n<p>\u201cIt also improves security,\u201d she said. \u201cPeople won\u2019t be wandering by themselves.\u201d<\/p>\n<p>New to the hospital is the planned retail pharmacy, to be located in a two-story medical office building on the south side of campus.<\/p>\n<p>Saunders said it will allow patients to get their prescriptions on the campus, instead of traveling elsewhere. That building will also become home for several doctors who currently work with the hospital but have offices elsewhere.<\/p>\n<p>Saunders said about 22 doctors plan to move into the building next year, and the hospital hopes to  recruit more.<\/p>\n<p>But unlike the office building, which still looks largely like a dirt foundation, the EMS station\u2019s exterior is mostly finished. When the inside is complete, it will include three bedrooms, a kitchen, a gym, a training room and enough garage space for five ambulances.<\/p>\n<p>With the sleeping quarters, emergency staff will be on duty at the hospital 24 hours a day. The hospital also plans to acquire two ambulances this summer, and Saunders said the main benefit of the new station will be to protect the vehicles.<\/p>\n<p>\u201cIf we have to turn on a truck and let it warm up, or get snow off, then that delays response,\u201d she said. \u201cWe want to make sure they can unplug and then go.\u201d<\/p>\n<p>While the project is going on, hospital staff and construction crew have had to take some extreme steps to keep it from affecting patients and doctors. This summer, all traffic is being directed to the front of the building so crews can work in the back, and that will be reversed when it comes time to tear down the existing front lobby and replace it. Meanwhile, in places where construction workers have to enter the hospital, they\u2019ve put up temporary walls to separate their entrance from the rest of the building.<\/p>\n<p>They\u2019re complete with \u201cnegative air machines\u201d that suck air out of the hospital proper and funnel it outside the building so that dust and debris from construction can\u2019t blow into patient quarters or operating rooms.<\/p>\n<p>\u201cAny dust or any dirt we stir up, we\u2019re taking it outside,\u201d Fleming said.<\/p>\n<p>Saunders said patients have occasionally had problems navigating through the construction zones, but the hospital has hired two people specifically to act as guides and ushers during the project. Fleming said hospital staff have been very easy to work with throughout the construction process. \u201cAny time we need something, we just ask them,\u201d Fleming said.<\/p>\n<p>\u201cThese projects are challenging, to try and keep them open \u2026 and they kind of know we\u2019re a necessary evil, and the sooner we get out of their hair, the better for everybody.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>the entire project is done, which hospital public relations director Haley Leonard Saunders said should be in 2018, it will include a new inpatient wing, a retail pharmacy, a new medical office building, additional parking, a new lobby and the EMS station. About 50 people are at work on the additions now, and project [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":70718,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[431,21,13,28,445,538,316],"naviga_topic":[],"class_list":["post-70717","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","tag-business-general","tag-cortez","tag-frontpage-lead","tag-headlines","tag-newsletter-lead","tag-southwest-memorial-hospital","tag-video"],"acf":[],"author_name":"dh_admin","_links":{"self":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/posts\/70717","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/comments?post=70717"}],"version-history":[{"count":0,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/posts\/70717\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/media\/70718"}],"wp:attachment":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/media?parent=70717"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/categories?post=70717"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/tags?post=70717"},{"taxonomy":"naviga_topic","embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/naviga_topic?post=70717"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}