{"id":56425,"date":"2013-10-29T21:27:16","date_gmt":"2013-10-30T03:27:16","guid":{"rendered":"https:\/\/dh.durangoherald.com\/tj\/school-oks-roof-repair\/"},"modified":"2026-03-29T15:53:34","modified_gmt":"2026-03-29T15:53:34","slug":"school-oks-roof-repair","status":"publish","type":"post","link":"https:\/\/dh.durangoherald.com\/tj\/school-oks-roof-repair\/","title":{"rendered":"School OKs roof repair"},"content":{"rendered":"\n<p>Initially slated to address the issue last month, school officials shelved the repair because of confusion regarding the bid, said superintendent Brian Hanson. The mix-up has since been resolved, and school officials awarded a $58,269 bid to Durango-based T&amp;L Roofing.<\/p>\n<p>\u201cWe will be spending close to $58,000 to repair the roof drains, the main area of concern,\u201d said Hanson. \u201cThe work also includes placing a new roof over both the lower and upper portions of the performance center.\u201d<\/p>\n<p>The work will start in November and take two weeks to complete, depending on the weather, Hanson said.<\/p>\n<p>The repair was authorized under a 2014 fiscal year capital reserve expenditure. The action also included authorizing an additional $18,970 for repairs, depending on the situation with the drains.<\/p>\n<p>In other news, Hanson informed school board members that October enrollment numbers have decreased by seven students. The drop equates to a $56,000 loss of revenue.<\/p>\n<p>The board is expected to approve the school\u2019s final 2014 budget in December.<\/p>\n<p><a href=\"mailto:tbaker@cortezjournal.com\">tbaker@cortezjournal.com<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Initially slated to address the issue last month, school officials shelved the repair because of confusion regarding the bid, said superintendent Brian Hanson. The mix-up has since been resolved, and school officials awarded a $58,269 bid to Durango-based T&amp;L Roofing. \u201cWe will be spending close to $58,000 to repair the roof drains, the main area [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[459,13,392,3443],"naviga_topic":[],"class_list":["post-56425","post","type-post","status-publish","format-standard","hentry","tag-construction-and-property","tag-frontpage-lead","tag-mancos-school-district-re-6","tag-school-safety"],"acf":[],"author_name":"dh_admin","_links":{"self":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/posts\/56425","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/comments?post=56425"}],"version-history":[{"count":3,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/posts\/56425\/revisions"}],"predecessor-version":[{"id":62592,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/posts\/56425\/revisions\/62592"}],"wp:attachment":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/media?parent=56425"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/categories?post=56425"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/tags?post=56425"},{"taxonomy":"naviga_topic","embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/naviga_topic?post=56425"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}