{"id":53683,"date":"2020-05-29T13:22:06","date_gmt":"2020-05-29T19:22:06","guid":{"rendered":"https:\/\/dh.durangoherald.com\/tj\/restriping-operations-throughout-southwest-colorado-to-begin-monday\/"},"modified":"2020-05-29T19:22:06","modified_gmt":"2020-05-29T19:22:06","slug":"restriping-operations-throughout-southwest-colorado-to-begin-monday","status":"publish","type":"post","link":"https:\/\/dh.durangoherald.com\/tj\/restriping-operations-throughout-southwest-colorado-to-begin-monday\/","title":{"rendered":"Restriping operations throughout Southwest Colorado to begin Monday"},"content":{"rendered":"<figure class=\"wp-block-image naviga-inline-image naviga-align-left alignleft\"><img decoding=\"async\" src=\"https:\/\/imengine.public.prod.dur.navigacloud.com\/?uuid=f4e9aeaf-3c9e-4f4e-be1c-b733bbefd3fa&amp;function=cover&amp;type=preview&amp;source=false&amp;width=2000\" width=\"1150\" height=\"1544\" alt=\"The Colorado Department of Transportation will begin restriping pavement marking throughout Region 5 in Southwest Colorado.\" class=\"naviga-image\" loading=\"lazy\"><figcaption><span class=\"caption\">The Colorado Department of Transportation will begin restriping pavement marking throughout Region 5 in Southwest Colorado.<\/span><span class=\"credit\">The Journal file<\/span><\/figcaption><\/figure>\n<p>The Colorado Department of Transportation will begin restriping pavement marking throughout Region 5 in Southwest Colorado.<\/p>\n<p>Restriping operations will begin Monday and continue through August.<\/p>\n<p>The restriping project will replace existing pavement markings and enhance highway striping on both asphalt and concrete pavements to improve visibility and help drivers stay in their lane.<\/p>\n<p>Striping operations are dependent on clear weather conditions. The targeted dates may fluctuate.<\/p>\n<p>Straight Stripe Painting, Inc. of St. George, UT has been selected for this project.<\/p>\n<p>Highways being restriped and approximate dates include:<\/p>\n<div class=\"naviga-element naviga-subheadline1\">Southwest Colorado<\/div>\n<p><em class=\"mwc_body_bullet_rr\">Monday-Wednesday, June 1-3: U.S. 491 Colorado\/New Mexico state line through Cortez and Dove Creek to Colorado\/Utah state line.<\/em><em class=\"mwc_body_bullet_rr\">Friday, June 5: U.S. 160 Cortez to Mancos.<\/em><em class=\"mwc_body_bullet_rr\">June 12-29: U.S. 550 from Colorado\/New Mexico State Line to Durango, over Red Mountain Pass to Colona.<\/em><\/p>\n<div class=\"naviga-element naviga-subheadline1\">South-central Colorado<\/div>\n<p><em class=\"mwc_body_bullet_rr\">Monday-Wednesday, June 1-3: U.S. 491 Colorado\/New Mexico state line through Cortez and Dove Creek to Colorado\/Utah state line.<\/em><em class=\"mwc_body_bullet_rr\">Friday, June 5: U.S. 160 Cortez to Mancos.<\/em><em class=\"mwc_body_bullet_rr\">June 12-29: U.S. 550 from Colorado\/New Mexico State Line to Durango, over Red Mountain Pass to Colona.<\/em><em class=\"mwc_body_bullet_rr\">July 1-Aug. 3: U.S. 160 from Mancos through Durango, Pagosa Springs, over Wolf Creek pass to Alamosa and finishes on La Veta Pass.<\/em><em class=\"mwc_body_bullet_rr\">Restriping operations will take place from 7 a.m. to 7 p.m. Monday through Saturday. Speeds will be reduced to 40 mph in work zones. Motorists are urged to use caution and watch for heavy equipment. <\/em>Through lanes and turn lanes may be temporarily closed to traffic. Travelers are discouraged from passing the striping truck and crossing over fresh paint, as this may damage a vehicle\u00e2\u20ac\u2122s finish.<\/p>\n<p>For information, call 703-3940, email <a href=\"mailto:Region5striping@gmail.com\">Region5striping@gmail.com<\/a> or visit <a href=\"https:\/\/www.codot.gov\/projects\/sw-colorado-highway-restriping\" target=\"_blank\" rel=\"noopener\">www.codot.gov\/projects\/sw-colorado-highway-restriping<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Colorado Department of Transportation will begin restriping pavement marking throughout Region 5 in Southwest Colorado.The Journal file The Colorado Department of Transportation will begin restriping pavement marking throughout Region 5 in Southwest Colorado. Restriping operations will begin Monday and continue through August. The restriping project will replace existing pavement markings and enhance highway striping [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":53684,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[202],"naviga_topic":[],"class_list":["post-53683","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","tag-briefs"],"acf":[],"author_name":"dh_admin","_links":{"self":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/posts\/53683","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/comments?post=53683"}],"version-history":[{"count":0,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/posts\/53683\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/media\/53684"}],"wp:attachment":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/media?parent=53683"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/categories?post=53683"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/tags?post=53683"},{"taxonomy":"naviga_topic","embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/naviga_topic?post=53683"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}