{"id":35984,"date":"2023-02-02T09:51:12","date_gmt":"2023-02-02T16:51:12","guid":{"rendered":"https:\/\/dh.durangoherald.com\/tj\/a-colorado-mountain-towns-water-may-become-some-of-the-priciest-in-colorado\/"},"modified":"2026-03-31T08:28:23","modified_gmt":"2026-03-31T08:28:23","slug":"a-colorado-mountain-towns-water-may-become-some-of-the-priciest-in-colorado","status":"publish","type":"post","link":"https:\/\/dh.durangoherald.com\/tj\/a-colorado-mountain-towns-water-may-become-some-of-the-priciest-in-colorado\/","title":{"rendered":"A Colorado mountain town\u2019s water may become some of the priciest in Colorado"},"content":{"rendered":"\n<p><figure class=\"wp-block-image naviga-inline-image\"><img decoding=\"async\" src=\"https:\/\/imengine.public.prod.dur.navigacloud.com\/?uuid=cee2f87f-a23c-54dd-b4af-29d45ce53e78&amp;function=cover&amp;type=preview&amp;source=false&amp;width=2000\" width=\"1200\" height=\"800\" alt=\"Downtown Ouray is shown from U.S. Hwy 550 in 2021. (William Woody, Special to The Colorado Sun)\" class=\"naviga-image\" loading=\"lazy\"><figcaption><span class=\"caption\">Downtown Ouray is shown from U.S. Hwy 550 in 2021. (William Woody, Special to The Colorado Sun)<\/span><\/figcaption><\/figure>\n<\/p><p>Nestled under the San Juan Mountains amid some of the deepest, cleanest snowpack in Colorado, and celebrated for hot springs, an ice festival and a drinking source burbling naturally through a filter of ancient lava, the city of Ouray will soon have another distinction it never expected: Some of the highest-priced drinking water in the state.<\/p>\n<p>State water quality officials declared in 2021 that Ouray\u2019s treasured, pristine aquifer had been infiltrated by microorganisms trickling through from surface creeks and runoff. Ouray needed a new, roughly $12 million treatment plant to meet Clean Water Act standards.<\/p>\n<p>\u201cOur water is not far enough in the ground to be thousand-year-old water,\u201d Ouray Mayor Ethan Funk said.<\/p>\n<p>In a community of 1,000, that water from a stone would cost $12,000 for each man, woman and child.<\/p>\n<p>Now another section of the state water division says Ouray isn\u2019t moving fast enough to get the treatment plant built. So make that $12,001,460 for the bill, when including a state-imposed fine of up to $1,500 for the delay.<\/p>\n<p>\u201cWe have a sewage plant that\u2019s being rebuilt, too,\u201d said Funk. The wastewater construction contract is for <a href=\"https:\/\/www.cityofouray.com\/news_detail_T2_R542.php\" id=\"link-814cfde02ca4d5d7862fa14cdfcbf652\" target=\"_blank\" rel=\"noopener\">$17 million.<\/a><\/p>\n<p>State officials acknowledge Ouray has been acting in good faith in trying to secure funds, design and contract for a major new treatment plant as quickly as possible.<\/p>\n<p>\u201cWe recognize that the city\u2019s been working diligently, and it\u2019s no easy task,\u201d Colorado Safe Drinking Water Program Manager Ron Falco said. \u201cBut at the same time, we\u2019ve got to fulfill our legal commitments as well.\u201d<\/p>\n<p>The state would like to point out it\u2019s not just hanging Ouray out to dry on the $12 million. Ouray can get a $12 million loan from a low-interest state revolving fund. And $5 million of the loan can be forgiven as a grant from the federal Bipartisan Infrastructure Law, with the state\u2019s blessing.<\/p>\n<p>And there\u2019s more, including a $750,000 grant from the Department of Local Affairs impact fund.<\/p>\n<p>Not wanting to sound too ungrateful, Funk chooses his words carefully when describing a bureaucracy at once munificent and punitive.<\/p>\n<p>\u201cIt doesn\u2019t make sense to me that the state is going to fine us, and that fine money\u2019s going to come out of the money that they gave us,\u201d Funk said.<\/p>\n<p>Ouray\u2019s journey from water bounty to water problems began in 2020, when state health department officials turned sights toward the city in a rotating survey of local drinking water supplies. Detailed sampling at the spring source turned up total coliform results beyond acceptable levels. Coliform can encompass potential E. coli and other bacteria, and a high count means the water needs a higher level of treatment.<\/p>\n<p>Coliform can come from soil bacteria or from human or animal waste carried through surface water. Falco said Colorado officials had no choice but to reclassify Ouray\u2019s source under the Clean Water Act from \u201cnaturally filtered groundwater\u201d to \u201cunder the influence of surface water.\u201d<\/p>\n<p>Short term, Ouray could add more chlorine to the source water and continue delivering to residents. Longer term, Ouray needed the more elaborate treatment plant usually associated with a bigger city.<\/p>\n<p>And under federal rules, Falco added, \u201cthat does start a clock.\u201d<\/p>\n<p>Ouray had 18 months from the 2021 notification to install and begin operating a plant.<\/p>\n<p>\u201cWe\u2019re at 80% design,\u201d Funk said. \u201cThings have been moving along at an incredibly fast rate and in spring, we should be ready to actually start construction.\u201d<\/p>\n<p>Finishing the plant and getting it online should take a year, he added.<\/p>\n<p>Still, the state\u2019s water quality enforcement section says rules are rules. On Jan. 10, the state sent Funk and the city a violation letter for \u201cfailure to provide adequate treatment of a public water supply,\u201d though Falco says up front Ouray is delivering safe water right now. The violations began after the 18 month clock ran out on Oct. 2, 2022, and are listed as \u201congoing,\u201d with a penalty range of $975 to $1,463.<\/p>\n<p>\u201cOngoing\u201d sent the mayor into, well, a funk.<\/p>\n<p>\u201cWe\u2019re trying to play as nice as we can,\u201d Funk said.<\/p>\n<p>His concern was the city would be fined that much for every day until the plant is finished.<\/p>\n<p>Not so, Falco assures Ouray.<\/p>\n<p>\u201cThat\u2019s not a per-day penalty whatsoever, it\u2019s a one-time penalty,\u201d Falco said. \u201cAnd again, that\u2019s kind of the maximum.\u201d<\/p>\n<p>As long as Ouray keeps up its good faith efforts to finish a new treatment plant, Falco said, the state will work with them to minimize the fine.<\/p>\n<p>Ouray has hosted bitter battles over water quality before. In the 2000s, an entrepreneur built a bottling plant and created biodegradable bottles to market spring water as an environmental alternative. <a href=\"https:\/\/www.denverpost.com\/2007\/02\/04\/controversy-bubbling-up-in-ouray\/\" id=\"link-b1df639306fc298010effd01d7a39330\" target=\"_blank\" rel=\"noopener\">The plant shut down after its tests showed mold and bacteria in the water it bought from Ouray<\/a>, but city and state tests said the incoming supply was fine. BIOTA never recovered from that and other business battles.<\/p>\n<p>The state\u2019s gentle stance on the current Ouray water fines don\u2019t put much of a dent in the overall price of the dust-up for Ouray. The money to pay back the treatment plant loans has to come from water ratepayers, not general tax money, Funk said.<\/p>\n<p>\u201cSo at the end of the day, Ouray is going to have one of the highest water rates in the state,\u201d Funk said. \u201cI\u2019ve seen charts. I don\u2019t think it\u2019s quite the highest, but it\u2019s pretty much on the shortlist.\u201d<\/p>\n<p><a href=\"https:\/\/coloradosun.com\/\" id=\"link-f35f0c3f8454428f5a5c087090f1fdf2\" target=\"_blank\" rel=\"noopener\"><em id=\"emphasis-af82496f8a39234891075c62bfd4a7d7\">The Colorado Sun is a reader-supported, nonpartisan news organization dedicated to covering Colorado issues. To learn more, go to coloradosun.com.<\/em><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>tells Ouray its ancient spring has been infiltrated and now needs $12 million in new filtration<\/p>\n","protected":false},"author":1,"featured_media":35985,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[28,1489,294],"naviga_topic":[],"class_list":["post-35984","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","tag-headlines","tag-ouray","tag-water-supply"],"acf":[],"author_name":"dh_admin","_links":{"self":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/posts\/35984","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/comments?post=35984"}],"version-history":[{"count":1,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/posts\/35984\/revisions"}],"predecessor-version":[{"id":83195,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/posts\/35984\/revisions\/83195"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/media\/35985"}],"wp:attachment":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/media?parent=35984"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/categories?post=35984"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/tags?post=35984"},{"taxonomy":"naviga_topic","embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/naviga_topic?post=35984"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}