{"id":110320,"date":"2015-08-10T19:19:16","date_gmt":"2015-08-11T01:19:16","guid":{"rendered":"https:\/\/dh.durangoherald.com\/tj\/m-chs-budgets-dip-from-12-estimates\/"},"modified":"2015-08-10T19:19:16","modified_gmt":"2015-08-11T01:19:16","slug":"m-chs-budgets-dip-from-12-estimates","status":"publish","type":"post","link":"https:\/\/dh.durangoherald.com\/tj\/m-chs-budgets-dip-from-12-estimates\/","title":{"rendered":"M-CHS budgets dip from \u201912 estimates"},"content":{"rendered":"\n<p><figure class=\"wp-block-image naviga-inline-image naviga-align-left alignleft\" data-naviga-align=\"left\"><img decoding=\"async\" src=\"https:\/\/imengine.public.prod.dur.navigacloud.com\/?uuid=5b33ed73-49f2-48f3-9214-b17c91635198&amp;function=cover&amp;type=preview&amp;source=false&amp;width=2000\" srcset=\"https:\/\/imengine.public.prod.dur.navigacloud.com\/?uuid=5b33ed73-49f2-48f3-9214-b17c91635198&amp;function=cover&amp;type=preview&amp;source=false&amp;width=800 800w, https:\/\/imengine.public.prod.dur.navigacloud.com\/?uuid=5b33ed73-49f2-48f3-9214-b17c91635198&amp;function=cover&amp;type=preview&amp;source=false&amp;width=1200 1200w, https:\/\/imengine.public.prod.dur.navigacloud.com\/?uuid=5b33ed73-49f2-48f3-9214-b17c91635198&amp;function=cover&amp;type=preview&amp;source=false&amp;width=1800 1800w\" sizes=\"auto, (max-width: 480px) 100vw, (max-width: 1024px) 100vw, 2000px\" width=\"1427\" height=\"2000\" alt=\"New assistant band director Katie Zdanowski moves instruments into the band room at the new Montezuma-Cortez High School. Even though they aren\u2019t being paid, many of the teachers have voluntarily started moving into the new building.\" class=\"naviga-image\" loading=\"lazy\"><figcaption><span class=\"caption\">New assistant band director Katie Zdanowski moves instruments into the band room at the new Montezuma-Cortez High School. Even though they aren\u2019t being paid, many of the teachers have voluntarily started moving into the new building.<\/span><span class=\"credit\">Sam Green\/Cortez Journal<\/span><\/figcaption><\/figure>\n<\/p><p>In comparison, current construction costs for the new Montezuma-Cortez High School are lower than initial figures. Current budgetary funds have also dipped over the past three years.<\/p>\n<p>When the project was announced in 2012, the total cost of a planned 162,500-square-foot schoolhouse was forecast at $43.9 million. The current 152,000 square-foot structure is now projected to cost a total of $41.5 million, a decrease of almost 5.5 percent over initial estimates, according to figures released by Montezuma-Cortez Re-1 superintendent Alex Carter.<\/p>\n<p>In an email sent to The Cortez Journal on Aug. 6, Carter revealed that soft and hard costs for the project, scaled down to a 152,000-square-foot facility, totaled more than $5.7 million and $35.8 million, respectively. Soft costs include architectural design, land acquisition and infrastructure systems. Hard costs include actual construction.<\/p>\n<p>In 2012, the district was awarded a $22.7 million Building Excellent Schools Today (BEST) grant to fund 52 percent of the total costs. The remainder of the project, which voters approved by a 5-to-3 margin, was a 20-year bond totaling $21.2 million.<\/p>\n<p>According to Carter, those numbers have also decreased from initial announcements. BEST grant funding now totals more than $22.2 million, a decrease of 2.2 percent over initial totals. Representing an 11 percent decrease, funding from property taxes also dropped to more than $18.9 million.<\/p>\n<p>In his email, Carter didn\u2019t offer an explanation for the decreases, but he did state that a $250,000 supplement from the school district\u2019s capital reserve fund would likely be reimbursed by $100,000.<\/p>\n<p>Approved in early 2014, the quarter-million supplemental expense was necessary to ensure the building included a geothermal heat exchange system, Carter said.<\/p>\n<p>According to Carter, final construction costs will become available in early December.<\/p>\n<p><a href=\"mailto:tbaker@cortezjournal.com\">tbaker@cortezjournal.com<\/a><\/p>\n<div class=\"naviga-scoreboard\">\n<h4 class=\"scoreboard-title\">M-CHS plans ribbon-cutting ceremony<\/h4>\n<p>On Friday, the public is invited to tour the new state-of-the-art Montezuma-Cortez High School at a public ribbon-cutting ceremony on Friday, Aug. 14.<br>\n                Starting at 4:30 p.m. Friday, the official opening is preceded by a free barbecue dinner and guided tours.<br>\n                The formal ribbon cutting ceremony with local dignitaries is held at 6 p.m., and self-guided tours of the building continuing through 8 p.m.<br>\n                Expanded coverage in Friday\u2019s Cortez Journal<br>\n                The Cortez Journal will have expanded coverage of the new building on Friday.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Costs, funding decline; Journal plans expanded coverage on Friday<\/p>\n","protected":false},"author":1,"featured_media":110321,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[5736,5735],"tags":[1724,13,1686,36],"naviga_topic":[],"class_list":["post-110320","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-local-news","category-news","tag-budgets-and-budgeting","tag-frontpage-lead","tag-heavy-construction","tag-montezuma-cortez-high-school"],"acf":[],"author_name":"dh_admin","_links":{"self":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/posts\/110320","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/comments?post=110320"}],"version-history":[{"count":0,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/posts\/110320\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/media\/110321"}],"wp:attachment":[{"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/media?parent=110320"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/categories?post=110320"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/tags?post=110320"},{"taxonomy":"naviga_topic","embeddable":true,"href":"https:\/\/dh.durangoherald.com\/tj\/wp-json\/wp\/v2\/naviga_topic?post=110320"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}